And this is our weekly plan:
7/9 - 7/10 WEEK1 (weekend)
-fix toilet
need plumber's putty
-measure other rooms so we know how much paint to buy
-buy stuff
fabric softner
-wallpaper roller
-6 rollers (3/8" to 1/2")
-sandpaper
primer (4 gallons)
paint for walls (3 gallons)
paint for ceilings (1 gallon)
paint for trim (1 gallon)
-pick out closets doors
-pick out fan (21" ?)
-price crown molding
-price miter saw
price nail gun
-price caulk (we have one tube)
-price door hardware
-price outlets
-price switches
-plastic for floors
-remove wallpaper in guest room
-remove cheap crown molding in guest room
-prep walls and ceiling (fill holes, sand, remove switch and outlet covers) in guest room
-price tvs, mounts, bluray, hd antenna
-pull toilet up to see what's under
-buy new toilet
-install toilet
7/11 - 7/14 (during the week)
-prep walls and ceiling in guest room since we didn't get it done over the weekend
-cleanup/packup/whatever any stray clothing/shoes/junk/whatever in master bedroom
-move furniture from master to guest room (bed is moved last on friday morning)
-throughly clean master bath
-buy tv and wall mount and hd antenna and bluray
7/15 - 7/17 WEEK2 (weekend)
-remove carpeting in master
-remove cheap crown molding in master
-remove vanity and toilet tank
-install wall mount and remove it for painting
cut any necessary holes in drywall to hide cableing
-prep walls and ceiling (fill holes, sand, remove switch and outlet covers) in master
-remove calk around windows, shower, sink, baseboards
-blue tape master
-buy paint
7/22 - 7/24 WEEK3 (weekend)
-paint ceiling in master bedroom and bath
-paint walls in master bedroom and bath
-move furniture from office to kitchen
-remove wallpaper in office
-remove cheap crown molding in office
-prep walls and ceiling (fill holes, sand, remmove switch and outlet covers) in office
-blue tape office
7/29 - 7/31 WEEK4 (weekend)
-paint office ceiling
-paint office walls
-caulk sides and top of windows, shower, sink
-install toilet tank and vanity
-move furniture from guest to master, move dressers to dining room
-paint ceiling in guest
-paint walls in guest
-note: ready for floor refinish in one week starting monday 8/8/2011
8/5 - 8/7 WEEK5 (weekend)
-thouroughly clean downstairs bathroom
-thouroughly clean theater room
-move master furniture downstairs
-move all other bedroom furniture downstairs, kitchen, living room
8/8 - 8/12 (during the week)
-Refinish hardwood floors
cost per square ft?
cost to replace damaged planks?
dust containment system?
600 sq ft
8/12 - 8/14 WEEK6 (weekend)
-while refinishing floors (2-3 weeks)
clean out basement
pick out pictures
order pictures
8/19 - 8/21 WEEK7 (weekend)
buy frames
buy lamps
buy fan
buy crown molding, miter saw, nail gun (can i use a miter box and circular saw?)
buy closet doors and rollers and track (4 of 24x80 6 panel doors)
during the last week, buy bed frame, night stands, bench
8/22 - 8/25 (during the week)
during the last week, paint trim and doors
during the last week, caulk bottom of windows
during the last week, install new door hardware
during the last week, install new outlets and switches
8/26 - 8/28 WEEK8 (weekend)
-put furniture back in office
-put furniture back in guest
sleep here until bedroom furniture is
-put together bed frame in master
-put together night stands, bench
-mount tv
9/1 - 9/4 WEEK9 (weekend - labor day)
-paint closet doors
-hang closet doors
-measure and cut crown molding for all bedrooms
-paint crown molding
9/8 - 9/10 WEEK10 (weekend)
-install crown molding
-hang pictures
While cleaning the shower; I missed our tv being shipped! So, I can go up to retrieve it around 8-9pm tonight. Luckily Jeff will be going with me so I won't have to do any heavy lifting. For those of you who don't know, I have degenerate disc disease (aka: bulging disc) on my L5-S1 disc and it hurts like crazy. There's nothing I can do to hurt it worse (except more pain of course) and surgery could fix it, but it might not. It seems like I'm stuck with back pain. So anywho, now my baby fever has been set back and I'm busy with getting things accomplished around the house for the renovations. Now if only we could have cooler weather.
Looks like I need to box up some shoes that I won't need for awhile.....lately, my footwear has only been consisted of flip flops....oh how I love flipflops :).
No comments:
Post a Comment